![Model Energy analysis showed this home to be 19% more efficient than standard home.](https://i2.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0504.jpeg?resize=224%2C300)
Model Energy analysis showed this home to be 19% more efficient than standard home.
![Cleared site.](https://i0.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0487.jpeg?resize=224%2C300)
Cleared site.
![Piling consolidated to go to hazardous waste facility.](https://i2.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0485.jpeg?resize=224%2C300)
Piling consolidated to go to hazardous waste facility.
![View from beach boardwalk of missing house.](https://i0.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0482.jpeg?resize=224%2C300)
View from beach boardwalk of missing house.
![Treated foundation piles being pulled out of the ground.](https://i1.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0480.jpeg?resize=224%2C300)
Treated foundation piles being pulled out of the ground.
![Creosote treated pilings are removed to go to hazardous waste site.](https://i2.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0479.jpeg?resize=224%2C300)
Creosote treated pilings are removed to go to hazardous waste site.
![Concrete pile from different angle.](https://i1.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0477.jpeg?resize=224%2C300)
Concrete pile from different angle.
![Concrete slab separated for recycling.](https://i0.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0476.jpeg?resize=224%2C300)
Concrete slab separated for recycling.
![Lot cleared for new construction.](https://i0.wp.com/www.christopherrosearchitects.com/blog/wp-content/uploads/2013/09/IMG_0475.jpeg?resize=224%2C300)
Lot cleared for new construction.